Some information about the building proposed by the president of the urban community Casstelroussine for the creation of the memory site of La Martinerie.
I would like to remind you that this building will affect us only if compagnies invest in the site, in the contrary case the C.A.C will refuse the inclusion of this site and we will not be able to take into consideration this building.
This is the building 01, the ex building of master craftsmen.
![]() |
ADVANTAGES :
• Located at the entrance of the zone
• 750m2,
• Possibility to isolate it from the zone,
• Direct access from the road and interior parking
• Possibility the welcome the association of the former civilian personnel of the American era, and if it were created, the association of the former 517e RT
THE PROBLEMS :
• Asbestos removal,
• Up to standard (especially electric) to welcome the public,
• The set up of a heating system, independent from the general circuit which will disappear,
• The isolation of the building, essential if the solution of heating by an heat pump is restrained,
• The removal of wooden joinery by the implementation of security glass as well as griddle on certain windows,
• The realization of diverse networks to disconnect the building from dependent installations of the camp (water, electricity, telephone, used water,…),
• The realization of fences to make all, the building and parking, independent from other routes of the camp.
• ……… .
THE PLAN OF THE ACTUAL BUILDING
|
THE PROJECT :
![]() |
Translation : Laëtitia DESROCHES
THE SITE MEETING |
Première réunion de chantier avec La CAPEB le 26 juillet 2012 (les chefs d'entreprises découvrent le site) |
Deuxième réunion de chantier avec un chef d'entreprise le 28 septembre 2012. |
Réunion de travail dans les locaux de La CAPEB le 7 novembre 2012. |
Nouvelle réunion de chantier avec des chefs d'entreprises de La CAPEB le 14 novembre 2012. |